- Model NO.: C007
- Molding Style: Forging
- Application: Auto Parts
- Heat Treatment: Quenching
- Forging Tolerance: +/-0.5mm
- Certification: CE, ISO 9001:2008
- Tolerance: Class CT8
- Trademark: ZD
- Specification: Class CT8
- HS Code: 84314990
- Processing Object: Metal
- Molding Technics: Pressure Casting
- Material: Steel
- Surface Treatment: Sand Blasting
- Standard: ASTM
- Dimension: Customized, as Per Your Samples or Dwg
- Weihgt: 0.1kg-150kg
- Transport Package: Standard Export Packing or as Per Your Requirement
- Origin: Ningbo China
Description: | Valve |
Application: | Transmission Machinery |
Material: | Alloy steel |
Material Grade: | GB, ASTM , AISI , DIN , BS, JIS, NF |
Drawing Format accept: | Pdf,Jpg,CAD,IGS,STP,Pro-E |
Mould Tooling: | Made by CNC Machine |
Casting Process: Mainly Machining Process: |
Precision casting By CNC |
Surface Roughness | Ra1.6 |
Lead time for sample | 25-30 days |
Delivery for normal order | 30-35 days |
Heat Treatment | Anealled |
Surface treatment | Sand blast |
Payment terms | T/T or negotiable |
Delivery port departure | Ningbo, Shanghai port |
Test Equipment:
Â
Why Choose us:
*Zhongda had been engaged in Casting and Machining industry for more than 18 years.
Â
*The whole production cycle is monitored by our Quality Management System ISO 9001:2008 certified.
* We now supply all forms of casting parts and cnc machining parts:  lost wax investment casting, sand casting, and cnc machining services.Â
Â
* Rich OEM service experience.
Â
* Our products has been sold to more than 30 countries, we are very familiar with the whole markets, expecially for Europe, North America,Australia and Canada markets.
Â
* Our Commitment & Responsiblity:
   1.Competitive Price
   2.Strict Quality Control
   3.Quick Response To Any Inquires,Complaint,Technical Problem,etc
   4.Timely DeliveryÂ
     5.Small Quantity Acceptable
FAQ:
1. How long can I get the price?
Prices will be quoted within 24 hours after we get your inquiry with detailed information ( including drawings, material, surface treatment,quantity, special requirements,etc).
Â
2.How can I get a sample to check your quality?
On the case of quotation confirmed.Sample will be free of charge for customer approval, freight collect.
Â
3.How long can I expect to get the sample?
It depends on, normally 25 days~30 days (including mould making time). Samples will be shipped by DHL, FedEx, UPS, TNT or EMS,ect.
Â
4.What about the leading time for mass production?
It depends on the order quantity. Normally, 30~45 days after receiving of deposit.Â
Â
5.What is your MOQ?
We don't have a strict limit, small quantity is also workable.
Â
Ptfe Seals ,Small Rubber Washer,Round Flat Rubber Washer,Clear Rubber Washers
Ningbo Robon Sealing CO.,LTD , https://www.robonseal.com